Product and Service Delivery process is seen as a sequence of activities starting from the initial Client contact through project delivery to measurement of final Client satisfaction. To demonstrate the sequence and interaction of related activities JAPL has adopted the following model for the Product and Service Delivery Process: (Not collapsible or hyperlinked)

In planning the processes for tendering and winning projects, JAPL addresses the following:
In order to ensure that the requirements, as specified by a project specification, will be met JAPL uses the following documentation:
| Contract Size | Tasks |
|---|---|
| Major and Medium contracts (Control Levels 2&3) |
JAPL prepares a Project Management Plan (PMP) in accordance with P-09 Project Management Plans. The PMP may incorporate a Quality Plan (QP), an Environmental Management Plan (EMP) and a Site Safety Plan (SSP), tailored for the project. The plan identifies key activities, which are controlled by way of approval from the Managing Director (MD) or nominated staff before work may proceed. The PMP is prepared following review of:
|
| Small contracts (Control Level 1) |
|
Client requirements for projects or service contracts are identified before a decision to prepare a quotation or tender submission. Further assessment is made once JAPL has been awarded a contract or order to supply a product or service.
Each quotation or tender submission is prepared using CL 01 - Project Proposal Checklist to ensure that:
Before submission of the tender and, as appropriate, accepting the order JAPL uses CL 02 - Project Establishment Checklist ensure that:
On completion of the review, should any resource be unavailable or any requirement need amplification, appropriate records of the same are maintained until the situation has been satisfactorily resolved.
JAPL identifies and agrees with the Client how an amendment to a contract will be carried out within the project organisation following a CL 03 - Project Scope Change assessment. The approval status of proposed changes is recorded in CL 04 - Project Variation Register and affected personnel notified accordingly.
All orders and project scope changes are approved by the Managing Director prior to the commencement of any work. The review records are controlled by P-02 Records Control and filed with the contract documentation.
Communication between JAPL and Clients is considered to be of the utmost importance to ensure that the delivered product is what the Client expected.
Several areas within this Business Management System set out the procedures for communication with the Client and other parties.
Project Management Plans detail the lines of communication between all parties involved in a particular project and in their absence the designated Project Manager is the principal contact.
Before the issue of the final Client Brief JAPL agrees with the Client appropriate design development stages, such as:
The responsibilities for the design and development activities are determined for the various disciplines and the Client.
The discipline and Client interfaces for communications are expressed in a Project Management Plan prepared in accordance with P-09 Project Management Plans.
This is an activity that must include the Client, JAPL and where necessary, its design sub-consultants
Validation activities can occur at any stage of the design and can be part of:
The results of the validation activities and necessary actions, are recorded and maintained in accordance with P-02 Records Control
Any proposed changes to the design may be identified and proposed by:
The proposed changes to the design, are recorded and maintained in accordance with P-02 Records Control
The proposed changes are reviewed, verified and approved by the parties deemed by JAPL to have influence on the outcome
The review outcome is assessed for its impact on:
The outcome of agreed change results are recorded and maintained in accordance with P-02 Records Control
The following design inputs are registered:
In order to provide adequate design definition any of the following outputs may be produced:
At the stages agreed in Planning the design is reviewed to ensure that:
This is an activity internal to JAPL and its design sub-consultants
Verification activities can occur at any stage of the design and can be part of:
It includes any relevant proprietary design information from previous similar projects
It may include any other known requirements for the final design to be fit for the intended use, where this is known
The results of the verification activities and necessary actions, are recorded and maintained in accordance with P-02 Records Control
JAPL ensures that all purchased products and services conform to specified requirements of the contract. The products may include any sub-contract work and supplies such as materials. The selection of sub-contractors, and the degree of control exercised, is dependent upon the product type, past sub-contractor performance and Client requirements.
All sub-contractors must be approved prior to use for the adequacy of their quality, environmental and OHS&R management practices. JAPL prefer to use pre-qualified sub-contractors, but do encourage new suppliers to apply.
Sub-contractors are assessed, either by JAPL, the Client, or by third party assessment.
Details of the control methods, responsibilities and the necessary assessment documentation are defined in Sub-contract Assessment - EM and Subcontractor Assessment - OH.
In the absence of an adequate quality, environmental and OHS&R system, the sub-contractors may be given the choice to work under JAPL Business Management System, provided they agree to be inducted to the system and undertake to follow it.
Purchasing documents contain a clear description of the product or service required, including any verification requirements for compliance with quality, environmental and OHS&R aspects.
All purchasing documents are reviewed prior to release to the sub-contractor, checked and maintained to provide clear, complete and specific information.
When formalising a purchasing Contract with suppliers, JAPL specifies, as necessary, its or the Client’s requirements for access to the supplier’s premises for any verification arrangements and the method of product release.
The suppliers are specifically advised that this verification activity does not substitute the supplier’s responsibility for effective quality, environmental and OHS&R management of its products or services.
All development and building activities are planned and defined prior to execution using the appropriate Control level in P-09 Project Management Plans.
The resulting documentation, work instructions, drawings, specifications, industry codes of practices and Australian Standards are used to control manufacturing and installation activities.
Such instructions identify (as appropriate):
Where appropriate, identification of important documents and components is maintained throughout the development and building activities. The approval status for the same will be maintained as necessary.
Project number is used in all project documentation. Ay further traceability is provided only when required by the contract.
All Client-supplied product, hardware, software and documentation in whatever medium, is identified, verified for correctness and placed in secure storage for later action.
Where the product does not meet the specified requirements it is quarantined and the Client informed to agree appropriate disposition action.
JAPL undertakes to apply all reasonable measures of identification, handling, storage and protection to preserve the conformity of the product to the time of 'practical completion'.
JAPL also ensures that any latent defects not caused by the building occupants during the 'defects liability period' (Commercial) or 'extended warranty period' (Residential) are protected against and/or rectified before 'final acceptance'.
Where the contract calls for processes, which cannot be fully verified by subsequent inspections or testing, JAPL identifies these in its Project Plan or ITP and develops and implements procedures to ensure that specified quality of the product is achieved, for example a high specified concrete strength.
Managing Director ensures that wherever there is such a process being carried out, the companies or persons responsible for that operation and conformance are adequately qualified and their skills are periodically reviewed through adequate sampling.
Where the sampling results show excessive variation, the process may need revalidation.
JAPL prefers to use approved sub-contractors to perform any inspection, measuring and testing that requires calibrated equipment traceable to national standards.
All tenders are reviewed prior to submission to determine the need for such equipment and where appropriate, approved sub-contractors are engaged and copies of the calibration certificates for the Inspection Measuring and Test Equipment used in the task are requested as a condition of engagement.